Shapeoko: Part 3

SH3-9

Leadscrew and motor assembled. Bearing is (roughly) flush with the bottom of the plate, and protrudes a bit at the top. Nuts are (as closely as possible) trapped between the coupler and the bearing. Coupler has a good grip on both the shaft and the leadscrew.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *